The objective my supervisor brought me there to let me see the field works and also learn some soft skills when dealing with problems and of course when dealing the people (government and site engineer). According to the my supervisor, the site engineer (Mechanical Engineering graduate and inexperience) employed by the contractor been giving them a lot of troubles; nevertheless my supervisor still have to teach some basic skills to the site engineer to make thing easier for everyone.
For that day, the site engineer requested them to the site to solve the perimeter drain problem. From our inspection, the invert level of the perimeter drain is lower than the main drainage. After some discussion with the site engineer and the JKR representative, they decided to not build some parts of the drain (least critical one) to raise the sump invert level before the main drainage. After that, we climb the elevated water tank to inspect the steel bars.
Some facilities view from 30m above ground:-
Hall
Library
Power Station