This project is handled by my host supervisor before I joined the consultancy firm. So, at the first week I work there. He brought me to site and explained all the detail he worked on and all the works I am going to do soon.
Let me write a little introduction about the project. This is an enlargement project for the existing SMK Wakaf Tapai which consists of only four blocks of building. The project has been started since late 2008 and expected to complete by end 2010. So, most of the main structures like hall, canteen, water tank tower and classrooms have been raised and I am just be there to do some mid-end phase stuff.

Talking about the my involvement in this project; initially I just went there with my host supervisor to listen about the discussion regarding the drainage system which is not built according to the engineer plan. The improper drainage built has caused some part of the road became small (less than 6m) and some is the wider. And here I got my first task which is recalculate all the invert level, gradient and design of the drainage and prepare an as-built drainage design report. The second task I got from this project is beam inspection for a small post guard house.

No comments:
Post a Comment